Model the construction
Describe conductors, insulation, screens and sheaths once — the structure becomes a versioned product definition.
Add-on
Standards-driven cable design that rolls straight into cost
Design cable constructions to standards, generate cross-sections, and roll materials and cost directly into the BOM.
What you get
یہ کیسے کام کرتا ہے۔
کیبل اور ہارنس انجینئرنگ کو دوبارہ قابل استعمال، لاگت سے آگاہ پروڈکٹ ڈیٹا میں تبدیل کریں۔
Describe conductors, insulation, screens and sheaths once — the structure becomes a versioned product definition.
Materials, weights and process steps are calculated from the construction instead of retyped in spreadsheets.
Copper, polymer and labour rates flow into the cost model, so a quote reflects today's prices, not last quarter's.
Approved revisions are pushed to production orders and technical data with a full change history.
30 منٹ کا سیشن بُک کریں — ہم آپ کے ڈیٹا کے ساتھ ان مراحل پر چلتے ہیں اور آپ کو رول آؤٹ کا تخمینہ دیتے ہیں CablePLM.
صلاحیتیں
CablePLM keeps the cable construction, its standards compliance and its economics in one model. Every layer you add is a material, a weight and a cost — not just a drawing.
Design is driven by standards and material data, not by redrawing: conductor, insulation, screen, armour and sheath are configured layer by layer, each with its own material, tolerance and consumption norm. The 2D cross-section and 3D preview update as you configure, and the resulting structure becomes a real BOM with routing and cost — so a quotation reflects the cable you would actually manufacture. Metal content is priced against the current LME base, so re-quoting after a price move is a recalculation rather than a project.
اکثر پوچھے گئے سوالات
اس ماڈیول کو فعال کرنے سے پہلے ٹیموں کے سوالات کے مختصر جوابات۔