High-mix assembly for MilTech and DefTech: distributed sites, fast engineering changes, serial-number traceability from supplier to handover.
Metalworking and mechanical engineering operations often run as high-mix, route-dependent production with strong constraints driven by machines, tooling, and skilled labor.
factory.online helps metal plants increase throughput, reduce WIP, and improve delivery performance by combining constraint-based planning with real execution visibility.
Specific challenges in metal & mechanical plants:
- Routing variability: each job follows unique operations; rework/inspection loops change routing dynamically.
- Bottleneck drift: constraints move between machining, heat treatment, finishing, QA, and dispatch depending on mix.
- Setup-dependent scheduling: tooling changes, fixture availability, CNC program readiness, and setup families.
- Tooling and gauge constraints: limited special tools, fixtures, measuring equipment, and calibration windows.
- Skilled labor constraints: dispatching must respect operator skills, shift patterns, and certification requirements.
- External processing: subcontracted operations (coating, heat treat) break the plan and hide WIP.
- Quality gates and inspections: hold/release cycles cause unpredictable queues and lead-time growth.
- Manual reporting and weak feedback: missing actual start/finish times prevents accurate capacity planning.
- Costing gaps: actual cycle times, scrap, and downtime not captured reliably.
**What factory.online delivers:
- High-mix routings overload one bottleneck machine → APS sequences finite capacity across work centres and alternative machines, so the constraint sets the pace instead of blocking it.
- Jobs disappear between machining, subcontract and assembly → WIP tracking with subcontract stages shows where every part is and how long it has been waiting.
- Delivery dates are promised from gut feeling → RCCP and what-if simulation validate the date against real machine calendars, shifts and holidays before you confirm the order.
- Real cost per part is unknown until it is too late → actual costing collects machine time, setup, scrap and rework per operation and compares it with the standard.
- Tooling and material shortages surface on the shift start → MRPII plans materials and tooling from the released schedule and flags gaps days ahead.