All industries

28 अग॰ 2026

Assembly & Miltech

High-mix assembly for MilTech and DefTech: distributed sites, fast engineering changes, serial-number traceability from supplier to handover.

Metalworking and mechanical engineering operations often run as high-mix, route-dependent production with strong constraints driven by machines, tooling, and skilled labor.

factory.online helps metal plants increase throughput, reduce WIP, and improve delivery performance by combining constraint-based planning with real execution visibility.

Specific challenges in metal & mechanical plants:

  • Routing variability: each job follows unique operations; rework/inspection loops change routing dynamically.
  • Bottleneck drift: constraints move between machining, heat treatment, finishing, QA, and dispatch depending on mix.
  • Setup-dependent scheduling: tooling changes, fixture availability, CNC program readiness, and setup families.
  • Tooling and gauge constraints: limited special tools, fixtures, measuring equipment, and calibration windows.
  • Skilled labor constraints: dispatching must respect operator skills, shift patterns, and certification requirements.
  • External processing: subcontracted operations (coating, heat treat) break the plan and hide WIP.
  • Quality gates and inspections: hold/release cycles cause unpredictable queues and lead-time growth.
  • Manual reporting and weak feedback: missing actual start/finish times prevents accurate capacity planning.
  • Costing gaps: actual cycle times, scrap, and downtime not captured reliably.

**What factory.online delivers:

  • High-mix routings overload one bottleneck machine → APS sequences finite capacity across work centres and alternative machines, so the constraint sets the pace instead of blocking it.
  • Jobs disappear between machining, subcontract and assembly → WIP tracking with subcontract stages shows where every part is and how long it has been waiting.
  • Delivery dates are promised from gut feeling → RCCP and what-if simulation validate the date against real machine calendars, shifts and holidays before you confirm the order.
  • Real cost per part is unknown until it is too late → actual costing collects machine time, setup, scrap and rework per operation and compares it with the standard.
  • Tooling and material shortages surface on the shift start → MRPII plans materials and tooling from the released schedule and flags gaps days ahead.

Pain → solution

What factory.online closes in Assembly & Miltech

Each module and add-on below is mapped to a concrete problem on your shop floor.

Scaling from a workshop to 5-10x serial volumes breaks manual coordination in messengers and Excel.

Finite-capacity APS sequences assembly and machining across sites and keeps the plan stable as volumes multiply.

Dozens of distributed and hardened sites create blind spots: nobody sees where a unit is or which serials went into it.

Work orders and WIP tracking give end-to-end serial-number traceability for every component, from supplier to handover.

PlanningModule

Assembly stalls because one part sits at another site and nobody knew it was missing.

MRP plans against real stock across every site, so kits are complete before the line starts.

PDMAdd-on

Engineering changes outrun the shop: a batch can be built to an outdated drawing or firmware v1.0 instead of v2.1.

PDM keeps items, drawings, firmware and revisions under one version control and releases only the approved version to production.

Inventory and transit are scattered across remote warehouses tracked in spreadsheets and chats.

Stocks gives one live view of balances and inter-site transfers, with role-based access that never exposes site locations.

Component and currency swings make it impossible to recalculate unit cost fast enough to quote safely.

Costing keeps planned and actual cost per order side by side and shows the variance as soon as it appears.

उपयोग के मामले

धातु और यांत्रिक इंजीनियरिंग के लिए उपयोग के मामले

वे ठोस कार्य-परिदृश्य जिन्हें हमारे ग्राहक सबसे पहले स्वचालित करते हैं — कोटेशन से लेकर भेजे गए पैलेट तक.

ड्रॉइंग-आधारित उत्पादन आदेश

रिलीज़ स्वीकृत संशोधन से शुरू होती हैं, इसलिए उत्पादन तल पर कभी भी पुराने ड्रॉइंग के अनुसार कटाई नहीं होती।

  • संशोधन नियंत्रण
  • परिवर्तन सूचनाएँ
  • उत्पादन तल पर दस्तावेज़ों तक पहुंच
PDM ऐड-ऑन

नेस्टिंग और सामग्री उपयोग की दक्षता

शीट और बार के बचे हुए टुकड़ों को वास्तविक स्टॉक के रूप में ट्रैक करें और नई सामग्री खरीदने से पहले उनका दोबारा उपयोग करें।

  • अवशिष्ट सामग्री की इन्वेंटरी
  • प्रति कार्य प्राप्त उपज
  • कटाई से बचे टुकड़ों का पुनः उपयोग
Stocks मॉड्यूल

उपठेकेदारों के साथ बहु-चरणीय प्रक्रिया मार्ग

गैल्वनाइजिंग, ताप उपचार या पेंटिंग अपने-अपने लीड टाइम और लागतों के साथ प्रक्रिया मार्ग में शामिल होते हैं।

  • बाहरी परिचालन
  • लीड टाइम की ट्रैकिंग
  • उपठेका खरीद आदेश
Production मॉड्यूल

मशीन भार और डिलीवरी तिथियाँ

सीमित क्षमता नियोजन बिक्री टीम को ऐसी तिथि देता है जिसकी वे प्रतिबद्धता दे सकें और उत्पादन इकाई को ऐसा क्रम जिसे वह लागू कर सके.

  • सीमित क्षमता
  • बाधाओं का दृश्य
  • प्रतिबद्ध तिथियां
Planning मॉड्यूल

अक्सर पूछे जाने वाले प्रश्न

Questions from manufacturers in this industry

आपकी फैक्टरी को स्प्रेडशीट और अंदाज़ों से बेहतर व्यवस्था मिलनी चाहिए