15 अक्टू॰ 2025
Smart Cable Manufacturing - Collaboration Highlights from Wire & Cable Poland 2025
At Wire & Cable Poland 2025, leading innovators showcased how AI, MES, and real-time planning are transforming cable manufacturing. Discover how factory.online and www.beedigit.com connects machines, planning, and data for next-gen production.

At Wire & Cable Poland 2025, BHAG Digital took part in the Nonferrous Track, joining leading innovators in wire drawing, MES, automation, and AI-driven inspection. The message was clear: the future of cable manufacturing is smarter, more connected, and data-driven.
One of the most rewarding parts of the event was our conversations with top machine manufacturers who share our vision of intelligent production:
- NIEHOFF — aligning digital service strategy with shopfloor execution and planning
- SAMP — exploring integration between planning modules and machine feedback
- PS Costruzioni Meccaniche — enabling better planning of rewinding and packaging lines
- EURODRAW — supporting flexible production planning through accurate feedback
- BETASISTEMI — synchronizing quality control automation with production planning
- LÄMNEÅ — improving lead time prediction through digital work order tracking
- CONTINUUS PROPERZI — modeling continuous processes in multi-scenario APS engine
Our factory.online platform becomes a natural digital layer for:
- Planning cable production and packaging with real-time constraints
- Managing semi-finished WIP and demand planning for long runs
BEEDIGIT for:
- Fast machine-to-MES connectivity to boost OEE
- Enable continuous quality control and smart inspections
- Predictive tools management
- Deliver digital job orders for truly paperless manufacturing.
We’re excited to help these manufacturers not just run production, but optimize it — using real data and dynamic planning.
Ready to explore how we can sync your machines and planning together?
Visit: www.factory.online | www.beedigit.com
