Add-ons

Extend your plan with independent modules

Each add-on is a product in its own right — attach the ones your operation needs, pay only for those.

Sales & Operations Planning (S&OP)

One consensus plan across demand, supply, capacity and finance

Balance demand, supply and capacity on a rolling horizon — including seasonal peaks, expiry dates, remote warehouses and market-specific SKUs — and turn the agreed plan into scheduling input.

  • Rolling demand and supply horizon
  • Capacity vs. demand balancing
  • Scenario planning and comparison
  • Consensus plan published to scheduling
  • Plan vs. actual tracking
  • Demand and supply balanced on one horizon

How it works

  1. Build the demand picture
  2. Test it against capacity
  3. Agree one plan

more steps

Su richiesta
Available forProAdvancedEnterprise
Explore Sales & Operations Planning (S&OP)

CRM

From contact to signed deal and invoice — with cable economics inside

Sales management built for manufacturers: pipelines, quotes and invoices with LME-linked cost and gross-margin control.

  • Contacts, organisations and activity timeline
  • Opportunity → lead → deal pipelines
  • Quotes, contracts, proformas, invoices with PDF output
  • Price lists with gross-margin control
  • Material structure, LME-linked cost base, packaging economics
  • Projects, tenders and delivery schedule

How it works

  1. Capture the lead
  2. Quote from real data
  3. Convert to orders

more steps

Su richiesta
Available forProAdvancedEnterprise
Explore CRM

CablePLM

Standards-driven cable design that rolls straight into cost

Design cable constructions to standards, generate cross-sections, and roll materials and cost directly into the BOM.

  • Standards-driven cable design
  • 2D / 3D cross-sections
  • Material and cost roll-up into BOM
  • Revision control
  • Hand-off to production
  • Layer-by-layer construction: conductor, insulation, screen, armour, sheath

How it works

  1. Model the construction
  2. Generate BOM and routing
  3. Cost and quote instantly

more steps

Su richiesta
Available forProAdvancedEnterprise
Explore CablePLM

PDM

Version control for everything engineering releases

Manage CAD, firmware and document revisions with check-in/check-out, engineering change notices and impact analysis.

  • Versioning for CAD, firmware and documents
  • Check-in / check-out and revision control
  • Engineering Change Notices (ECN)
  • BOM revisions with approval flow
  • Impact analysis on stock, WIP and orders
  • CAD connectors

How it works

  1. Capture documents
  2. Control revisions
  3. Publish to the floor
Su richiesta
Available forProAdvancedEnterprise
Explore PDM

AI Agents (Co-Pilot)

Anticipates bottlenecks, suggests the fix, you decide

AI co-pilot for planning, inventory and scheduling: recommendations and scenario simulations with human-in-the-loop approvals.

  • Bottleneck anticipation
  • Inventory analysis and coverage advice
  • Scheduling recommendations
  • Scenario simulation
  • Natural-language system overview
  • Human-in-the-loop approvals

How it works

  1. Connect to live data
  2. Detect and explain
  3. Propose the next action

more steps

Su richiesta
Available forAdvancedEnterprise
Explore AI Agents (Co-Pilot)

Project Management

For project-based and engineer-to-order manufacturing

Run projects end to end: BOQ, Gantt with critical path, resources, costs, change orders and installation.

  • Portfolio dashboard: schedule, cost, margin
  • BOQ driving budget and scope
  • Gantt with dependencies, critical path and baselines
  • Resource planning and loading
  • Cost tracking vs. budget and change orders
  • Linked sales, material and manufacturing orders

How it works

  1. Structure the project
  2. Plan the work
  3. Track time and cost

more steps

Su richiesta
Available forProAdvancedEnterprise
Explore Project Management

Services

Repair, modification, installation and scheduled maintenance

Service management for repair and maintenance work: defectation, service orders, brigades, kiosks and material requirements.

  • Service objects and versioned service models
  • Incoming inspection, defectation and defect acts
  • Service order lifecycle with rework loop
  • Routing templates and service types
  • Workers, brigades and qualifications
  • Kiosk modes for worker, inspector, supervisor

How it works

  1. Register the request
  2. Schedule the crew
  3. Execute on site

more steps

Su richiesta
Available forProAdvancedEnterprise
Explore Services

WMS

Warehouse execution from the gate to the shipped truck

Full warehouse management: yard, receiving, handling units, traceability, replenishment, waves, picking, packing and shipping.

  • Yard and gate control with doors and dock sessions
  • ASN/PO receiving, quick receipt, returns, GRN and putaway
  • Handling units, splits, merges, batch genealogy, traceability
  • Stock explorer, transfers, adjustments, holds
  • Min/max replenishment and cycle counting
  • Waves, picking, packing, shipping and deliveries

How it works

  1. Receive and put away
  2. Track every location
  3. Pick, pack, ship

more steps

Su richiesta
Available forProAdvancedEnterprise
Explore WMS

Add-ons pay for themselves — start with the one that hurts most

Tell us where production hurts today. In one live session we show which add-on pays off first and how it plugs into the modules you already run.

  • Live walkthrough of the add-ons you care about
  • Per-user cost estimate for your team
  • Integration plan with your current systems