Capture documents
Drawings, CAD exports and specs are attached to items and operations instead of living in shared folders.
Add-on
Version control for everything engineering releases
Manage CAD, firmware and document revisions with check-in/check-out, engineering change notices and impact analysis.
What you get
Як це працює
Єдине контрольоване сховище креслень, специфікацій і редакцій.
Drawings, CAD exports and specs are attached to items and operations instead of living in shared folders.
Every change gets a revision, an author and an approval trail; superseded files stay readable but clearly retired.
Operators always open the current revision from the work order — no printed copies to go stale.
Book a 30-minute session — we walk these steps through with your data and give you a rollout estimate for PDM.
Capabilities
PDM keeps every technical artefact — CAD models, drawings, firmware, PDFs — under versioning with check-in / check-out, so nobody manufactures from an outdated file.
Engineering Change Notices (ECN) drive BOM revisions through a controlled approval flow. Before a change is released, impact analysis shows exactly what it hits: current stock, work in progress, open purchase orders and released production orders.
CAD connectors (e.g. SolidWorks) push revisions into the same loop production and purchasing already work in.
Every engineering artefact — CAD models and drawings, firmware, test protocols and PDFs — lives under check-in/check-out with a revision history that cannot be quietly overwritten. Engineering Change Notices carry the change through review and approval, and impact analysis shows what the change touches before it is released: which BOMs, which open manufacturing orders, which stock on hand and which work in progress. CAD connectors keep the design tool and the system in step, so the shop floor never works from a superseded drawing.
Поширені запитання
Short answers to what teams ask before switching this module on.