Add-on

Storage space, GB

Expand file and document storage in the capacity your operation needs.

Sur demande
Available forStandardProAdvancedEnterprise
Storage space, GB shown as a schematic isometric scene

What you get

    How it works

    Storage space, GB, step by step

    A short path from setup to measurable result.

    Set it up with us

    We switch the add-on on inside your existing environment and map it to how you already work.

    Connect your data

    Items, orders and history from the core platform feed the add-on — no parallel database.

    Run and measure

    Your team works in one place and the results show up in the same reports as the rest of the factory.

    See Storage space, GB running on your own process

    Book a 30-minute session — we walk these steps through with your data and give you a rollout estimate for Storage space, GB.

    See Storage space, GB running on your data