Product Costing
Do you know your costs — or just guess them?
Transparent plan/actual figures. See where profit is leaking and make decisions based on data, not intuition.
- Planned cost based on standard prices and rates
- Actual cost based on real expenses and time
- Plan vs actual comparison for precise management decisions
-15%
Deviations between planned and actual cost
+25%
Faster decision-making thanks to transparent data
-15%
Indirect losses caused by inaccurate calculations
How it works
Costs without guesswork
Know exactly how much production costs — with plan/actual in real time.
Standard costing
The system calculates costs based on standard rates.
Actual expenses collection
Data on consumed materials and time are collected automatically.
Actual costing
Real cost per each product and order is calculated.
Standard vs Actual comparison
See variances instantly and act on them right away.
Standard, actual and the gap between them
Costing is calculated from the same BOMs, routings and shop-floor records the plant runs on — not re-typed into a spreadsheet.
- Standard cost built from BOMs, routings and resource rates
- What-if simulation before quoting a price or accepting an order
- Actual cost from recorded consumption, machine time and labour
- Variance analysis by product, batch, material and resource
- Margin visible per order line, not only at month end
Roles
What will you gain?
Transparent understanding of profitability
Clear visibility of which products generate the most profit.
Pricing design
Confident pricing decisions ensuring costs are covered and margins achieved.
Strategic decisions support
Which products to grow, optimize, or phase out.
Scope
What's in the box?
Planned cost calculation by direct costs (materials, work centers, manpower).
Use of standard material prices and labor rates.
Actual cost calculation based on real stock prices and actual operation times.
Cost accounting for finished goods and each input item.
Plan vs actual comparison with variance analysis.
Identification of deviations by category and item.
Automated reports for management decisions.
Built for real production
More control where manufacturers feel the pain
Practical capabilities that remove rework, hidden delays and spreadsheet handoffs from daily operations.
Stock history follows the business date
Review movements in the period they belong to, not only when someone clicked save.
Included from ProMake-or-buy answers without another export
Use ready reports for stock movement, turnover and purchasing decisions.
Included from ProPurchased services reach product cost
Subcontracting and service receipts complete the true cost picture.
Included from ProWhy it matters
What product costing teams get
Smaller cost deviations
Standard and actual costs are compared automatically, order by order.
Faster decisions
Transparent cost data replaces intuition with evidence.
Fewer indirect losses
Accurate calculations reveal where inaccurate estimates were costing you.
Customers
Trusted with their finances
I now get planned and actual cost data for every order. This helps explain variances and make cost optimization decisions.
Liam B.
Finance Controller
Actual costs per operation are recorded automatically — far fewer manual calculations.
Noah W.
Cost Accountant
Costing data is available much faster than before — enabling timely reactions.
Oliver S.
Cost Accountant
Now we know where inefficiencies appear — and cut costs precisely at the source.
James W.
Financial Analyst
FAQ
Frequently asked
Explore more
Other capabilities
Solutions by industry
