All industries

28 août 2026

Assembly & Miltech

High-mix assembly for MilTech and DefTech: distributed sites, fast engineering changes, serial-number traceability from supplier to handover.

Metalworking and mechanical engineering operations often run as high-mix, route-dependent production with strong constraints driven by machines, tooling, and skilled labor.

factory.online helps metal plants increase throughput, reduce WIP, and improve delivery performance by combining constraint-based planning with real execution visibility.

Specific challenges in metal & mechanical plants:

  • Routing variability: each job follows unique operations; rework/inspection loops change routing dynamically.
  • Bottleneck drift: constraints move between machining, heat treatment, finishing, QA, and dispatch depending on mix.
  • Setup-dependent scheduling: tooling changes, fixture availability, CNC program readiness, and setup families.
  • Tooling and gauge constraints: limited special tools, fixtures, measuring equipment, and calibration windows.
  • Skilled labor constraints: dispatching must respect operator skills, shift patterns, and certification requirements.
  • External processing: subcontracted operations (coating, heat treat) break the plan and hide WIP.
  • Quality gates and inspections: hold/release cycles cause unpredictable queues and lead-time growth.
  • Manual reporting and weak feedback: missing actual start/finish times prevents accurate capacity planning.
  • Costing gaps: actual cycle times, scrap, and downtime not captured reliably.

**What factory.online delivers:

  • High-mix routings overload one bottleneck machine → APS sequences finite capacity across work centres and alternative machines, so the constraint sets the pace instead of blocking it.
  • Jobs disappear between machining, subcontract and assembly → WIP tracking with subcontract stages shows where every part is and how long it has been waiting.
  • Delivery dates are promised from gut feeling → RCCP and what-if simulation validate the date against real machine calendars, shifts and holidays before you confirm the order.
  • Real cost per part is unknown until it is too late → actual costing collects machine time, setup, scrap and rework per operation and compares it with the standard.
  • Tooling and material shortages surface on the shift start → MRPII plans materials and tooling from the released schedule and flags gaps days ahead.

Pain → solution

What factory.online closes in Assembly & Miltech

Each module and add-on below is mapped to a concrete problem on your shop floor.

Scaling from a workshop to 5-10x serial volumes breaks manual coordination in messengers and Excel.

Finite-capacity APS sequences assembly and machining across sites and keeps the plan stable as volumes multiply.

Dozens of distributed and hardened sites create blind spots: nobody sees where a unit is or which serials went into it.

Work orders and WIP tracking give end-to-end serial-number traceability for every component, from supplier to handover.

PlanningModule

Assembly stalls because one part sits at another site and nobody knew it was missing.

MRP plans against real stock across every site, so kits are complete before the line starts.

PDMAdd-on

Engineering changes outrun the shop: a batch can be built to an outdated drawing or firmware v1.0 instead of v2.1.

PDM keeps items, drawings, firmware and revisions under one version control and releases only the approved version to production.

Inventory and transit are scattered across remote warehouses tracked in spreadsheets and chats.

Stocks gives one live view of balances and inter-site transfers, with role-based access that never exposes site locations.

Component and currency swings make it impossible to recalculate unit cost fast enough to quote safely.

Costing keeps planned and actual cost per order side by side and shows the variance as soon as it appears.

Use cases

Use cases for metals & mechanical engineering

Concrete scenarios our customers automate first — from the quote to the shipped pallet.

Drawing-driven production orders

Releases start from the approved revision, so the shop never cuts to an outdated drawing.

  • Revision control
  • Change notices
  • Shop-floor document access
PDM add-on

Nesting and material yield

Track sheet and bar remnants as real stock and reuse them before buying new material.

  • Remnant inventory
  • Yield per job
  • Offcut reuse
Stocks module

Multi-stage routing with subcontractors

Galvanising, heat treatment or painting sit inside the route with their own lead times and costs.

  • External operations
  • Lead-time tracking
  • Subcontract POs
Production module

Machine load and delivery dates

Finite-capacity planning gives sales a date they can commit to and the shop a sequence they can run.

  • Finite capacity
  • Bottleneck view
  • Promise dates
Planning module

FAQ

Questions from manufacturers in this industry

Your factory deserves better than spreadsheets and guesswork