Model the construction
Describe conductors, insulation, screens and sheaths once — the structure becomes a versioned product definition.
Add-on
Standards-driven cable design that rolls straight into cost
Design cable constructions to standards, generate cross-sections, and roll materials and cost directly into the BOM.
What you get
Jak to działa
Przekształć projekty kabli i wiązek w dane produktowe do wielokrotnego wykorzystania, uwzględniające koszty.
Describe conductors, insulation, screens and sheaths once — the structure becomes a versioned product definition.
Materials, weights and process steps are calculated from the construction instead of retyped in spreadsheets.
Copper, polymer and labour rates flow into the cost model, so a quote reflects today's prices, not last quarter's.
Approved revisions are pushed to production orders and technical data with a full change history.
Book a 30-minute session — we walk these steps through with your data and give you a rollout estimate for CablePLM.
Capabilities
CablePLM keeps the cable construction, its standards compliance and its economics in one model. Every layer you add is a material, a weight and a cost — not just a drawing.
Design is driven by standards and material data, not by redrawing: conductor, insulation, screen, armour and sheath are configured layer by layer, each with its own material, tolerance and consumption norm. The 2D cross-section and 3D preview update as you configure, and the resulting structure becomes a real BOM with routing and cost — so a quotation reflects the cable you would actually manufacture. Metal content is priced against the current LME base, so re-quoting after a price move is a recalculation rather than a project.
FAQ
Short answers to what teams ask before switching this module on.