All industries

28 sie 2026

Jobshop & Custom Production

Extreme variability — optimize schedules and enforce execution discipline with trusted feedback.

Jobshop and custom production environments are defined by extreme variability: changing routings, urgent priorities, limited skilled resources, and daily constraint shifts. factory.online helps jobshops deliver on time, improve profitability, and scale output by optimizing schedules and enforcing execution discipline with trusted feedback.

Specific challenges in jobshops: • High-mix, low-volume complexity: unique routings and frequent engineering changes. • Constant priority changes: expediting breaks plans; promised dates become unreliable. • Setup family constraints: sequence-dependent setups, tooling limits, and changeover penalties. • Skill-based dispatching: few key operators become hidden bottlenecks. • Material readiness: missing components create stop-start production. • WIP explosion: too many open orders create long queues and slow flow. • Quoting vs capacity reality: delivery promises not aligned with real constraints. • Subcontract operations: external steps add uncertainty and hidden lead time. • Manual scheduling: spreadsheets cannot optimize under real constraints.

What factory.online delivers:

  • Every quote is a guess → quoting on real routings and standard costs, then compared with actual cost after the job to fix the next estimate.
  • Urgent orders wreck the whole schedule → APS reschedules in minutes and shows the delivery impact of every priority change before you accept it.
  • Skilled operators are the real constraint → work centres, shifts and skill levels are planned as finite resources, not as unlimited capacity.
  • Customers call to ask where their order is → real-time order progress per operation, visible to sales without walking to the shop floor.
  • Overtime and expediting quietly kill profit → actual costing per job exposes rework, waiting and overtime so you can price or eliminate them.

Pain → solution

What factory.online closes in Jobshop & Custom Production

Each module and add-on below is mapped to a concrete problem on your shop floor.

SalesModule

Every quote is a guess and the cheap jobs turn out to be the loss-makers.

Quotes are built from real routings and standard costs, then compared with actual cost after delivery.

One urgent order wrecks the whole week of planning.

APS reschedules in minutes and shows the delivery impact of a priority change before you accept it.

Multi-stage custom orders need coordination that production orders alone cannot express.

Project Management links engineering, procurement and production stages into one deliverable timeline.

Overtime, rework and expediting quietly destroy profit on custom jobs.

Actual costing per job exposes waiting, rework and overtime so they can be priced or eliminated.

Przykłady zastosowań

Przykłady zastosowań w zakładach usługowych i produkcji na indywidualne zamówienie

Konkretne scenariusze, które nasi klienci automatyzują w pierwszej kolejności — od oferty po wysłaną paletę.

Szybko wyceń jednorazowe zlecenie

Wykorzystaj podobne zlecenia z przeszłości, aby wycenić nowe zapytanie na podstawie rzeczywistych danych kosztowych zamiast intuicji.

  • Wyceniaj na podstawie danych historycznych
  • Struktura kosztów
  • Wersje oferty
Dodatek CRM

Marszruta technologiczna dla produkcji projektowanej na zamówienie

Twórz BOM i marszrutę technologiczną w trakcie realizacji zlecenia, rejestrując zmiany zamiast przekazywać je krzykiem przez halę.

  • BOM tworzona na bieżąco
  • Historia zmian
  • Postęp każdej operacji
Dodatek Project Management

Rejestracja czasu i zużycia materiałów na hali produkcyjnej

Operatorzy rejestrują czas i zużycie materiałów na terminalu, więc koszt zlecenia jest aktualny, a nie znany dopiero na koniec miesiąca.

  • Rejestracja na terminalu
  • Koszt zlecenia w czasie rzeczywistym
  • Alerty o przekroczeniach
Moduł Production

Zlecenia obsługi posprzedażowej i serwisu

Naprawy, obsługa gwarancyjna i prace w terenie są realizowane jako osobne zlecenia powiązane z dostarczonymi urządzeniami.

  • Zlecenia serwisowe
  • Historia maszyn i urządzeń
  • Przydzielanie zadań w terenie
Dodatek usługowy

FAQ

Questions from manufacturers in this industry

Twoja fabryka zasługuje na więcej niż arkusze kalkulacyjne i zgadywanie