A plan that lies is worse than no plan at all

We give you a schedule that always reflects reality.A production GPS, not a static picture.

Job Orders scheduling
Manufacturing Business Intelligence
Increase productivity

+20%

Higher productivity through reduced downtime
Produce on time

-30%

Less time lost on changeovers
realtime visibility

+25%

Real-time transparency of task statuses

In short,

Always know status
Scheduling is your “Production GPS”.

The system builds minute-by-minute execution schedules for manufacturing tasks and automatically reschedules them when the situation changes — from unexpected breakdowns to urgent orders.
Real-time control of execution
Result: an always up-to-date plan, realistic statuses, and maximum speed in fulfilling customer orders.

A schedule that lives with production

The automatic “Production GPS” reshapes the schedule in real time whenever equipment status or order priorities change.

01
Job Orders creation

Automatic generation of Job Orders from Manufacturing Orders

Details
02
Assigning to work centers

Considering availability, priorities, and alternatives

Details
03
Sequence optimization

Accounting for setups, changeovers matrices, and transfer times

Details
04
Production GPS

Automatic rescheduling in case of breakdowns, downtime, or new priorities

Details
05
Maintenance sync

Integration with repair and service schedules

Line

What will you gain?

  • Commitment
    Full control of work centers

    All jobs and statuses in a single picture

  • Configuration
    Automatic rescheduling during breakdowns or downtime

    Система сама перебудовує графік у разі аварій чи простоїв.

  • Always know status
    Minimal manual intervention

    The schedule adapts automatically, freeing time for management decisions

  • Trust increased
    Prioritization of urgent orders

    Critical orders are always on top without disrupting the rest of the plan

  • new
    Transparency for reporting

    Management sees a clear picture of statuses and results in real time

  • Digital transformation
  • Real-time control of execution
    Clear orders for the team

    Operators see precise instructions with start and finish times.

  • Configuration
    Automatic queue updates

    Any changes are instantly reflected in the live task sequence.

  • Multi-scenario simulations
    Less chaos between shifts

    A transparent schedule reduces conflicts and misunderstandings across departments.

  • Speed
    Fast response to issues

    In case of unexpected disruptions, the system reschedules instantly without delays.

  • Inventory
    Fair resource allocation

    Tasks are distributed optimally, reducing conflicts and overload.

  • Digital transformation
  • Suppliers performance analysis
    Realistic delivery forecasts

    You see actual order completion times in real time.

  • Transparency
    Transparent view of bottlenecks

    The system highlights exactly where production loses throughput.

  • Commitment
    More accurate customer promises

    Orders are planned based on real resources and equipment status.

  • Product Costing
    Reduced downtime costs

    Automatic task rescheduling minimizes losses from stoppages.

  • Real-time control of execution
    A tool for strategic management

    Forecasting and data empower better decisions to boost efficiency.

  • Digital transformation

What’s in the box?

factory.online
Point

Automatic generation of Job Orders from MTS/MTO Manufacturing Orders

Point

Detailed minute-by-minute execution schedules

Point

Job Orders assigning across work centers with availability and alternatives in mind

Point

Optimized Job Orders sequencing with setups, changeovers and transfer times considered

Point

Changeover time matrixes for products and characteristics

Point

Dynamic Job Orders rescheduling in case of downtime or repairs

Point

“Production GPS” functionality — adaptive real-time rescheduling

Point

Integration with maintenance schedules for work centers

Point

Realistic execution timeline “as of this hour”

Point

Prioritization of critical and urgent orders

Point

Transparent visualization of sequence and Job Order statuses

Trusted with process optimization

StarStarStarStarStar
My operators no longer wait for instructions. They see the current task on screen, even in case of a breakdown.
Liam B.
Production Planner
StarStarStarStarStar
Thanks to optimization, we cut setups by 20%. The system shows how best to group tasks.
Noah W.
Process Engineer
StarStarStarStarStar
Before, we lost time manually moving tasks around. Now the system automatically reschedules based on equipment status.
Oliver S.
Supervisor
StarStarStarStarStar
The system has become our production navigator. Tasks are rescheduled automatically, and we no longer lose hours on manual replanning.
James W.
Supervisor
scroll left
scroll right

From chaos to control — launch factory.online scheduling
that works in real time.

Grow faster with factory.onlineStart trial