Inventory Management

Inventory without chaos or blind spots

Stock levels always up-to-date, every batch traceable. No more "Where is it stored?" or "Why is it already expired?"

  • Always know stock levels across all storage locations in real time
  • Full batch traceability with QR codes and expiration dates
  • Automatic updates on movements and stocktakes

-25%

Less frozen stock

-50%

Stock-taking mismatches

99+%

Real-time visibility of actual stock levels

How it works

Inventory always under control

No blind spots — every batch and stock level is traceable in real time.

Stock flow: goods moving between receiving, storage and shipping locations

Material receipts

Batches created with QR codes and expiration dates.

Stock updates

Synchronized data across all warehouses.

Stock-taking

Mobile app for fast physical inventory checks.

Track & Trace

Every batch tracked to final usage.

Barcode work on the shop floor

Warehouse and shop-floor staff work from a handheld terminal instead of a clipboard — every scan lands in the system immediately.

  • Stock review by location, batch or drum number
  • QR-based stock-taking with instant variance against system quantities
  • Transfers between locations, generated automatically from job order demand
  • Batch split and merge, with the new batches inheriting full genealogy
  • Label reprinting by batch or drum number, directly from the terminal

Batch genealogy, end to end

Trace any finished drum back to the raw material, or any suspect raw batch forward to every customer who received it.

  • Full raw-material-to-customer trace on every batch
  • Forward trace for recalls: which orders, drums and customers are affected
  • Backward trace for claims: which supplier lot and which shift produced it
  • Quarantine of batches pending quality release
  • Audit-ready history without assembling evidence by hand
Batch genealogy: raw material batches traced through production to the finished drum
Full batch traceability, end to end

Roles

What will you gain?

Transparent control of supply

GRN instantly updates PO statuses — a clear view of what's received and what's still on the way.

Full batch traceability

QR codes, expiration dates, complete tracking of materials and products.

Online stock monitoring

Real-time visibility across all storage locations.

Scope

What's in the box?

Material and product receipts with automatic GRN creation

Link to POs for fulfillment tracking

Automatic batch creation with QR codes and shelf-life control

QR code printing for physical labeling

Real-time stock monitoring across multiple locations

Batch-level item traceability

Manual adjustments after stocktakes or discrepancies

Supply vs demand comparison for shortage forecasting

Automatic PR/PO generation and supplier orders

Inventory movements across locations with batch traceability

Stock management strategies: FIFO, LIFO, FEFO (expiry date based) and ABC/XYZ classification for priority control.

Built for real production

More control where manufacturers feel the pain

Practical capabilities that remove rework, hidden delays and spreadsheet handoffs from daily operations.

Quarantine before consumption

A batch under inspection cannot reach production before quality releases it.

Included from Pro

Trace every batch both ways

Find the source of a defect and every finished product or customer it affects.

Included from Advanced

Use the right material batch

Batch attributes keep variable raw materials and customer requirements under control.

Included from Advanced

Packaging and containers stay visible

The physical form of stock matches its digital record at receipt and issue.

Included from Pro

Scan it instead of typing it

Find stock and print labels faster with fewer warehouse mistakes.

Included from Standard

Stop negative stock before posting

Users see the risk before inventory records become distorted.

Included from Standard

Count stock on the real business date

Post controlled adjustments into the period where the movement belongs.

Included from Pro

Why it matters

What your team gets: Inventory Management

Less frozen stock

Real-time visibility keeps working capital out of the warehouse.

Fewer stock-taking mismatches

Batch-level tracking keeps physical and system counts aligned.

Full traceability

Every batch is tracked from receipt to shipment with QR codes.

Customers

Trusted with their inventory

I find needed batches much faster because everything is labeled and traceable.

Liam B.

Warehouse Supervisor

We manage expiration dates better and write off fewer materials.

Noah W.

Warehouse Manager

Stock levels are visible in real time — this reduced unnecessary material orders.

Oliver S.

Warehouse Manager

QR coding and automatic stock updates gave me an accurate picture of our warehouses. We reduced discrepancies after stocktakes and now find the right batches much faster.

James W.

Inventory Controller

FAQ

Frequently asked

Bring order to your warehouses with factory.online