Rough-cut capacity and material planning, scenario modeling, and throughput forecasting.
The system shows capacity loads and material needs before problems arise, helping you choose the optimal scenario.
Resource and material requirements calculated by days/weeks/months
Identification of bottlenecks and critical materials
Parallel calculations for different what-if cases
Assessing the impact of changes on throughput
Work shifts, holidays, and planned maintenance included
See capacity utilization days, weeks, or months in advance.
Spot critical resources and materials at the planning stage, not in crisis.
compare alternative plans and pick the best one.
Changes are updated instantly, no messy recalculations in Excel
The system automatically determines required materials and components.
The planner sees what is missing now and what will become critical in the future.
Simultaneous calculation of multiple scenarios to choose the best option.
Safety stocks, reorder points, or just-in-time purchasing can be set individually for each material.
Clear visibility into whether production can handle future demand.
Bottlenecks are eliminated in advance through planning.
Planning is based on actual data, not guesswork.
Planning data becomes the foundation for company-level decisions.
Rough-Cut Capacity Planning (RCCP)
Workforce requirements planning with constrained/unconstrained availability models
Material planning (MRP) with supply and safety stock consideration
Automatic detection of bottlenecks and critical materials
Scenario modeling for simulation analysis and decision-making
Parallel calculations for multiple scenarios
Calendars for shifts, holidays, and maintenance schedules
Throughput forecasting for production
Visualization of resource load by days, weeks, months