A Unified Digital Ecosystem for Manufacturing Management
Modern manufacturers face daily challenges: data scattered across different systems, limited control over equipment, and process management still relying on outdated spreadsheets or fragmented solutions. The result is lost productivity, wasted energy, and reduced profitability.
BEEDIGIT is a lightweight MES/OEE system that connects to any production equipment via a simple plug & play approach. It provides real-time monitoring of performance, energy consumption, and machine status, while automatically recording production output, scrap, downtime, and changeovers.
With BEEDIGIT, companies gain a clear view of their true OEE, uncover losses and hidden reserves, reduce unplanned stoppages, and increase throughput — all without capital investments. It delivers 24/7 transparency and control over your shop floor.
Combined with factory.online, BEEDIGIT creates a single digital control loop — from order planning to real-time machine execution.
What the Integration Delivers
🔄 Unified Digital Loop
All business processes — sales, purchasing, planning, inventory, production — are connected directly to machine data.
Result: no blind spots, full transparency, reliable execution.
⚡ Real-Time Operations
Monitor machine workload and productivity in real time
Automatic recording of task execution times, finished products, scrap, and material usage
Energy consumption tracking and efficiency loss detection
🔌 Plug & Play Simplicity
BEEDIGIT connects to any sensors or machines without complex integrations or costly modifications.
📦 Transparent Batches & Inventory
Integration automatically links material and product batches with Job Orders. Every movement of materials or products is instantly reflected in the system.
🛠 Shopfloor Control
Production orders from factory.online are automatically sent to work centers via BEEDIGIT
Execution, downtime, changeovers, and scrap are tracked in real time
Data flows back into factory.online for analysis and decision-making
💰 No Extra Systems Required
No need to implement separate MES or SCADA systems — everything runs seamlessly with factory.online, lowering TCO and accelerating ROI.
How It Works (Process Flow)
Orders are created in factory.online
Material and product batches are passed to the system
Job Orders are distributed across work centers
BEEDIGIT captures machine data: output, scrap, waste, energy consumption
Results flow back into factory.online: inventory, order statuses, real-time execution
Key Benefits of Integration
👨💼 For Owners & Top Management
End-to-end visibility: from order to delivery
Real-time control of performance and energy costs
Faster and more confident decision-making
🏭 For Production Managers
Automated recording of output, scrap, and waste
Less manual work — more trusted machine data
Full control of Job Orders and resources
💹 For Economists & Financial Analysts
Actual production times integrated into cost accounting
Comparison of planned vs. actual performance
More accurate financial and operational insights
🛠 For Engineers & Supervisors
Simple equipment connectivity, no complex projects
Instant alerts on downtime, failures, or energy anomalies
Practical tools to improve efficiency at each work center
In Summary
The integration of factory.online +BEEDIGIT is the path to Smart Manufacturing, where planning, control, and execution are connected into a single ecosystem.
You gain:
Transparent accounting
Realistic, adaptive plans
Data that drives profitability and reduces losses
👉 Your production GPS: from order to finished product.